Hüppa põhisisu juurde
Raamatukoi
Tõde ja õigus

Sussex Railway Stations Through Time

Douglas d'Enno · Amberley Publishing · 2016

Sussex Railway Stations Through Time

It was in 1841 that the London & Brighton Railway constructed the line from Norwood (linking with the London & Croydon Railway) to the coast. The lines built between 1841 and 1868 formed a comprehensive countywide network, extending from Three Bridges to Midhurst and Chichester in the west and (via the South Eastern Railway) from Tunbridge Wells to Bexhill, thence to Rye, in the east. The county’s coastal stations yield their own interesting story. Apart from the stations on main routes, those on branch lines and wayside halts are also included.

In this book, Douglas d’Enno explores the absorbing and sometimes colourful story of one county’s railway stations. The older photographs feature early postcards and carefully selected images from railway archives and publications. When juxtaposed with their present-day equivalents, the extent of the change in these facilities for rail passengers can be fully appreciated.

Saadavus
20,00 €

Uus kasutamata raamat

Täna tellides on tarneaeg umbes 9 päeva (27.11.2026)Tellimuse täitmise aeg on umbkaudne ja sõltub nädalapäevast, millal tellimus tehakse. Reeglina ei kulu üle kahe nädala.

Tarne ja kättesaamine

Detailid

ISBN
9781445648767
Aasta
2016
Keel
inglise
Köide
Pehme kaas
Lehekülgi
96
Teema
Elustiil, sport ja vaba aeg › Autod, rongid, laevad, lennukid — Transport: general interest
Kaal
282 g